The contracts of the first phase and second phase of the project were signed on September 30th, 2020 and January 26th, 2021 respectively. The project was designed to store bulk grain (wheat, corn). The grain can be classified into different grade of storage after collected. The project occupies a total land area of 76263 square meters. It is located within the Alashankou Bonded Area.