The scope of works includes the consolidation work on 20,000 mu of newly added arable land in Taigu Area.
With a floor area of 12,770 square meters, the project consisted of 36 classrooms and corresponding supporting facilities. As the general contractor, CITIC Construction began the construction in 2002 and completed it in 2003.
The contract for The BELGEE Passenger Car CKD Plant Project was signed in March 2015. The project owner is CJSC "BELGEE", a Chinese- Belarusian joint venture founded by Geely Holding Group (Geely), a Chinese car manufacturer, Open Joint Stock Company OJSC "BELAZ", a Belarusian enterprise specializing in mining machinery, as well as Closed Joint Stock Company "Soyuzau-totechnologii", a Belarusian joint venture dedicated to parts business. According to the blueprint for the project, a new production line with capacity of 60,000 passenger cars per year will be built in Borisov
Located in the middle of Myanmar, Myanmar Multifunctional Diesel Engine Plant Project is owned by the Automobile and Diesel Engine Industry Bureau of Myanmar No. 2 Industry Ministry. The contract of the plant with designed annual production capacity of 700 units TBD234 diesel engines was signed in October 2004. As a "Financing plus EPC" turnkey project, the project was China's largest general contract project in the machining industry in Southeast Asia. In September 2010, the certificate of completion was granted to the project.
In November 2008, witnessed by then Argentine President, CITIC Construction signed a supply contract with the Transport Affairs Secretariat of the Ministry of Federal Planning, Public Investment and Services of Argentina for 45 carriages to Line A of the Buenos Aires Underground . In March 2013, all carriages were officially put into operation. Online carriages are in sound operating condition.
Located to the south of the first phase of the K.K. Project in the southern suburbs of Angola’s Luanda Province, it is the major municipal project of the first batch of 10,000 projects under the second phase of the K.K. Project. With a planned area of 249 hectares, a contract amount of 607 million dollars and a contract period of 28 months, the project includes roads, water supply and drainage system, sewage system, electric lighting system, reclaimed water system, afforestation, traffic signal, natural gas system, telecommunication system and out-of-redline projects. The project was signed on December 21, 2015.
The works include the construction of a breeding pig farm capable of accommodating 2400 sows.
The first-class highway design standard was adopted for this two-way six-lane highway with a total length of 26.145 km (including 22.738-kilometer-long trunk line and 3.407-kilometer-long branch line) and a designed speed of 60 km/h. The whole project included large, middle, and small bridges along the highway of a total length of 1,074.44m (excluding super-large bridges and bridges within the interchange scope), a 1,178.2-meter-long super-large bridge (Dongjiang Fourth Bridge), two large bridges (762.08m), three middle-sized bridges (226.36m) and five small bridges (86m). The Huizhou Cross-city Highway Project built altogether five interchanges, one trunk line toll station and one maintenance zone. The project began in 2002 and was completed in 2005.
On November 26, 2016, CITIC Construction and Belarusian National Biotechnology Corporation (BNBC) signed an EPC contract for the Belarus Hi-tech Agro-industrial Full Cycle Complex Project, of which the contract amount is $ 853.19 million, and the project duration is 36 months. The project is located at the Pukovicsky district of Minsk, the capital of Belarus. Adopting modern biotechnology to deep process crop seeds, the project aims to produce irreplaceable amino acids (lysine, tryptophan, etc.), and further produce high-yield and high-tech balanced compound feed and biological activator. The construction mainly includes: a lysine plant with an annual output of 50,000 tons, a tryptophan plant with an annual output of 5,000 tons, a balanced compound feed plant with an annual output of 1 million tons, a oil crop processing plant with an annual output of 300,000 tons, a 600-million-ton silo grain storage with drying facilities, and a grain production base with an annual output of 1 million tons with supporting infrastructure project and field pipe network.
IT Research and Development Center of CITIC Bank is a R&D center and manufacturing operation center invested and constructed by CITIC Bank in Shunyi New Town of Beijing, which includes R&D building A, R&D building B, manufacturing operation building, underground parking garage and other public buildings. The total land area of the project is 57,000 square meters and the total construction area is 179,000 square meters. The project is a